We are executing site preparations and foundation work covering approximately 4,000 m³ at the Knuten property area in Hallsberg. This includes preparing the groundwork and casting concrete slabs for a new parking area, installing a modern stormwater drainage system, and managing the final site finishing.

 

Challenges and Solutions

When it became clear that the existing stormwater system plans were inaccurate, we worked closely with the client and contractor to find a solution. A rapid redesign was carried out, allowing us to adapt the construction plans to actual site conditions.

 

Collaboration

Byggpart and Hallbo have been highly engaged clients, and the collaboration has been seamless. Through open dialogue and mutual trust, we have efficiently tackled challenges along the way.